Procurement guide

CNC machining RFQ checklist for comparable supplier quotes.

A clear RFQ reduces hidden assumptions and makes supplier quotations easier to compare technically and commercially.

Send drawings for review

Geometry

3D CAD and controlled 2D drawing

Commercial

Quantities, target date and destination

Technical

Material, finish and critical features

Quality

Inspection, certificates and traceability

Technical package

Send one controlled definition of the part

The model defines geometry while the drawing defines tolerances, GD&T, threads, surface finish, edge conditions and special notes. Make sure both carry the correct revision.

  • STEP or other agreed neutral CAD format
  • PDF drawing with revision identifier
  • Material grade and acceptable equivalents
  • Finish, masking and cosmetic zones

Commercial and quality

State what must arrive with the parts

Quantity, delivery destination, packaging and documentation can materially change a quotation. List prototype and production volumes separately where possible.

  • Prototype and annual or batch quantities
  • Target delivery date and destination
  • FAI, CMM or dimensional report scope
  • Material certificates, labeling and packing

Questions buyers ask

Technical answers before the RFQ.

Can an RFQ be sent before every detail is final?

Yes. Mark open decisions clearly and request options rather than allowing suppliers to make different assumptions.

Why provide both prototype and production quantities?

It helps evaluate setup, material purchasing, inspection and fixture choices across the expected program stages.

Continue your evaluation

Related manufacturing information

Capability is confirmed against your drawing.

Send CAD, drawing, material, quantity, finish, inspection requirements and target date for an engineer-led review.

Request a quote